Our bathroom is turning out great! While Micah was here, we mudded and sanded the drywall, primed and painted the bathroom, and built the shower. The shower is a walk-in shower with tile 3/4 the way up the wall. These pictures are over several days work.


Here is the walk-in shower before when it was just framed in.
The things on the bottom are to help the slope, so the water will
drain.

Adam mudding the ceilings and walls.

Pouring the concrete in the bathroom.

Concrete is almost done in the shower.

This is where the whirlpool jet tub will go

Adam screwing the concrete boards to the wall. The tile
will eventually go on top of these boards.

Concrete boards are all in.

Here is the bench for the shower.

Ready for tile.

Kristi priming the walls in the bathroom.

No more green drywall.

Painted above the concrete boards.


Starting to lay the mosaic tiles for the floor.

Isn't it pretty.

Kristi started off cutting the tile.

until Aaron arrived. We made him a little tool
bench to cut the tiles on.

Micah placing the thin set on the back of the tile.
This is what makes it stick to the surface.

Begining of tiling the shower.



Tiling the bench.




Looking so good.




Inserts for the shower. This is where shampoo
and soap will go. I was at work while they were doing this.
They worked until 4am on this. Those inserts took forever.

All the tile is done! BEAUTIFUL!!


All that is left to do is grouting and sealing.


Grout and sealer is done. Can it be any more
beautiful?



I love it more than I ever imagined it!