Monday, May 24, 2010

Flooring..cont..

May 2010:
Our neighbor came over one Saturday morning and in just 5 hours, the 2 of them finished a whole room. They were kicking butt!








Note: Curved walls make it hard to install floors.



Floors!

May 2010:
Now that the painting is done upstairs, the next step is to install the hardwood floors! We bought this hardwood floors last summer at an auction.

This is a closet in one of the bedrooms!



First, you put down roofing tar paper.



This is the super cool flooring nailer that we are borrowing from a friend.

Ethel the elephant is such a help!

Closet done!


Upstairs Guest Bathroom

May 2010:
While Kristi was painting, Adam was working on our first guest bathroom! We got the beautiful tile, vanity, and medicine cabinet all from Lowes! I think it turned out beautiful!


Adam tiling...Notice where the toilet is supposed to go???



New vanity!!

Painted light beige!


Now, notice where the toilet is now??
Tile is done. Just have to clean and seal it!


After the faucet was put in.




Painting

May 2010:
After everything was sanded, it was time for KRISTI to paint! I painted the living room upsatirs the same color as downstairs. Two of the bedrooms are a very light green in color, and the 3rd bedroom is a light aqua in color!

This room is the light aqua color.

Same room, different wall


Living Room, Rocky Mountain Sky!

The one picture of Kristi painting. Do you like my ladder?

Other side of the living room looking into another room


Drywall, Sanding, Mudding, Painting..AGAIN!

April 2010:
Does this stuff ever end? After completely ignoring the upstairs for the last year, we decided to start working on it. The upstairs is our extra bedrooms and bathrooms. We have family coming up to visit in June for my sister's wedding, and we were hoping to have enough done on the house so they would be able to stay with us.

The upstairs had all the drywall up, but not much of it was mudded or sanded. So, we had to start kicking butt!








This is our bathroom upstairs! I guess the tub gave that one away!




Closet!

March 2010:
Just in time for Kristi's birthday, her closet was just about finished. She is loving her new closet! For months now, we were living out of one dresser, laundry baskets, and hanging clothes from random places in the house.


This is where Adam was hanging his work clothes BC (Before closet)
So, he decided to build a closet





YAY!!!!!!!!!!!!!!!!!!!


New Addition

February 22, 2010.

I just had to put this in here. :) Adam and I expanded to our little family back in February. After much thought, we named him Carlos!!!!!!!!! We love Carlos! He is a 2007 Acura TL.




New Faucet in Tub

March 2010:
We got a new faucet (Guess what kind of faucet?) for the the tub? Yay for running water!!!




WOW!!!!!!

I can not believe I have not posted anything since January. I was just thinking the other day, is it really May already? Wow...this year is going by fast. I am going to try to backtrack.

February 2010:
Apparently, not much happened this month as I was looking back through my pictures.
We did tile around the bathtub in our master bathroom. This really makes the bathroom look beautiful. I can't wait until I can take a bath in it!